Successfully imitates the natural characteristics of wood.
The material of the soffit is so durable that no maintenance is required.
Leave your details and our employees will get in touch with you to proceed your order.
More detailed information about the installation
Proper installation of the gutters protects them from the snow mass. The gutter should be mounted on the front board so that its outer edge must not protrude above the eaves of the roof. Follow the diagram.
The first stage of gutter installation is to determine the position of the joint with drainage, which will be the lowest point of the gutter system.
Fix the gutter brackets directly to the front board. The maximum distance between the brackets should be 40 cm. Set a slope of 2 mm for each linear meter to the joint with drainage. Place a bracket at a maximum distance of 15 cm from each end of the gutter.
Install the gutter brackets to the front board, starting with the one that is furthest from the drain joint. Use a well-stretched rope to set a slope of 2 mm for each linear meter from the farthest gutter bracket to the drain joint. Fix the joint with drainage and all brackets, following the line of inclination.
Cut the gutter to the required size with a hacksaw and clean.
You can download price list, brochure, certificates, declarations and more.
View more products from this category