PVC GUTTER SYSTEM INES

PVC GUTTER SYSTEM INES

Lexon - ines system numberd

  • 1 PVC Gutter
  • 2 Gutter fascia bracket
  • 3 Gutter Angle
  • 4 Gutter Union
  • 5 Running Outlet
  • 6 Gutter stopend
  • 7 Pipe ∅80
  • 8 Branch ∅80
  • 9 Pipe bracket ∅80
  • 10 Pipe connector ∅80
  • 11 Bend 67,5
  • 12 Fastening pipe clamp
  • inse color White White (RAL 9010)
  • inse color Beige Beige (RAL 1001)
  • inse color Gray Gray (RAL 7040)
  • inse color Red Red (RAL 3011)
  • inse color Brown Brown (RAL 8017)

Безкомпромисно качество
10 години гаранция

Lexon Ines system logo

Lexon Ines system 10 Years garantee pictogram

  • lexon INES system component image

    PVC Gutter 3m

    Sizes
    L: 3m, B: 78 mm , A: 120 mm
  • lexon INES system component image

    Gutter stopend

    Sizes
    L: 37mm
  • lexon INES system component image

    Gutter Angle

    Sizes
    L1: 208 mm, L2: 57 mm
  • lexon INES system component image

    Branch ∅80

    Sizes
    H: 174 mm, Dw: 80 mm

  • lexon INES system component image

    Gutter fascia bracket

    Sizes
    H: 115 mm
  • lexon INES system component image

    Pipe bracket

    Sizes
    H: 25 mm, Dw: 80 mm
  • lexon INES system component image

    Gutter Union

    Sizes
    H: 92 mm
  • lexon INES system component image

    Bend 67,5

    Sizes
    H: 160 mm, Dw: 80 mm, Dz: 77 mm

  • lexon INES system component image

    Running Outlet

    Sizes
    L: 170 mm, Dz: 80 mm
  • lexon INES system component image

    Pipe connector ∅80

    Sizes
    H: 82 mm, Dw: 80 mm
  • lexon INES system component image

    Pipe ∅80 3m

    Sizes
    H: 3 m, Dz: 80 mm
  • lexon INES system component image

    Fastening pipe clamp L 180

    Sizes
    L: 120 mm, 160 mm, 180 mm,
    220 mm, 250 mm

  • image of installtion step 1

    Correct positioning of gutters under the eaves

    A correct installation must protect the gutters from impact by the snow sliding down the roof. The upper edge of the gutter flanging should not go over the roofing edge, as shown in the figure above.

  • image of installtion step 2

    Positioning the drop outlets

    The first step of the gutter system instalation process is to locate the drop outlet which is the lowest component in the gutter line.

  • image of installtion step 3

    Installing the gutter hangers

    Fasten the gutter hangers directly to the fascia board of the roof. The maximum spacing of the gutter hangers is 40cm. Install the gutter line with a downgrade of 2mm in height per 1 m of length towards the drop outlet.

  • image of installtion step 4

    Setting the correct gutter downgrade

    First, fasten the gutter hanger furtherest from the drop outlet position along the roof edge, then fasten the drop outlet. Use a tighly tensiond string to set the correct gutter line downgrade between the two fas-tened components. Proceed with fastening the components directly to the fascia board along the string's line.

  • image of installtion step 5

    Trimming the gutters and down pipes to size

    Trim the gutters to size by cutting square to the gutter centrline li a fine tooth saw.

  • image of installtion step 6

    Conecting the gutter to the drop outlet

    Slide the gutter end under the inner flanging of the drop outlet. Snap the gutter end snugly within the inner flanging at its correction marks

  • image of installtion step 7

    INSTALLING THE GUTTERS ON THE GUTTER HANGERS

    Start by inserting the inner part of the gutter under the back clamp of the gutter hanger; next, snap the gutter flanging into the front clamp.

  • image of installtion step 8

    INSTALLING THE GUTTER JOINTS

    Insert the gutter under the inner flanging of the gutter joint until the gut-ter snaps into the front flanging. Next, slide the gutter under the holding paws, down to the connection marks.

  • image of installtion step 9

    INSTALLING THE END CAP

    The end cap is designed to be mounted on either end of a gutter. Mount the end cap snugly on the entire end edge of the gutter.

  • image of installtion step 10

    INSTALLING THE DOWN PIPES UNDER THE EAVES

    Push fit the down pipes with the fastened drop outlets, elbows and down pipe joints. If the eaves go more than 10 cm in front of the wall, make a down pipe offset by trimming a straight down pipe section to size. Install the elbow, the trimmed down pipe section, another elbow and the down pipe running down the wall. Leave a 10 mm clearance to compensate for the thermal length variation of the pipe.

  • image of installtion step 11

    INSTALLING THE DOWN PIPE CLAMPING RINGS

    Fasten the down pipe clamping rings to the wall with the hook bolts and plugs in the wall holes. Use the stabilising faA§ade flanges if the hook bolts feel loose in the wall. The maximum spacing of the down pipe clamping rings is 2-2.5 m.

  • image of installtion step 12

    INSTALLING THE DOWN PIPE JOINTS

    Push fit the down pipe joints between the down pipes. The arrow marks on the components must match the running direction of drained water. Leave a 10 mm clearance in each down pipe connection socket to com-pensate for thermal length variation

Ценова листа

Брошура

Сертификат за съответствие

Warranty



Select category